[1]
Wang, C.-H., Liu, Y., Mao, B.-Y. and Li, C.-H. 2026. Scheduling Model for Complex Equipment Development Considering Project Robustness. International Journal of Industrial Engineering: Theory, Applications and Practice. 33, 4 (Jul. 2026). DOI:https://doi.org/10.23055/ijietap.2026.33.4.11183.