Wang, Chen-Hao, Yong Liu, Bo-Yan Mao, and Chi-Heng Li. 2026. “Scheduling Model for Complex Equipment Development Considering Project Robustness”. International Journal of Industrial Engineering: Theory, Applications and Practice 33 (4). https://doi.org/10.23055/ijietap.2026.33.4.11183.